IndyTilth wins 2013 Indianapolis Sustainability Award
Help complete the rain garden on April 20, 2013!
Check out photos from previous workdays!
Learn more about the Mid-North Make Change Water Currency program!
Thanks to the many neighbors and KIB volunteers who have helped with wave 1 of rain garden plantings. Over the course of 3 intensive work days (and some work in between!), we have removed asphalt in the tree lawn adjacent the rain garden, placed parking bumpers, and planted countless trees, shrubs, and native grasses. Next spring, we will complete the rain garden plantings with native plant plugs and additional shrubs in the rain garden itself. Stay tuned to the blog and volunteer page for more details. In the meantime, check out the before, during and after pictures!
Volunteer with us in fall 2012
Double 8 Foods parking lot to be transformed into a RAIN GARDEN!
We need your help…
at 555 Fairfield Avenue
We will provide drinks, lunch and all necessary materials/tools
October 27, 9am – 1pm
Help remove asphalt to prepare a 6’ wide strip along Park Avenue to plant trees and install parking bumpers.
Not for the faint of heart…
November 24, 9am – 1pm
Plant trees and shrubs, seed native grasses, and mulch.
December 1, 9am – 12pm
Grade tree lawns, install remaining parking bumpers, plant native shrubs and grasses, mulch everything!
Stay tuned for opportunities to help maintain the rain garden beginning spring 2013!
Spread the word!
FOR MORE INFORMATION,
contact Sarah at 317.797.3392 or sarah@indytilth.org
Rain garden heavy construction has begun!
Hooray! After almost 2 years of planning, we have broken ground on the Double 8 Foods Rain Garden. Come check out the progress…
Thanks goes to our many partners for their very generous donations!
We are now looking for volunteers so that we can realize the beautiful plan within our existing budget. Please see the Volunteer! page for more details on upcoming events.
Spread the word!!
We can’t say enough about Adam Garvey, owner of Gardens of Growth. From the time we started working with Adam in August, he has done somersaults to help us get the project built. Not only did Adam help us to “value-engineer” the project, he also leveraged his professional relationships to secure donations of materials. Wow. Adam is a pleasure to work with, and continues to work hard on a daily basis to keep the project on time and on budget. Adam really gets it done. Thank you!
Meeting notes (5/4/11)
Attendees
Sarah Wiehe (IndyTilth project manager)
Isaiah Kuperstein (Double 8 Foods owner)
Tyson Domer (IndyTilth construction manager)
Craig Flandermeyer (Schmidt Associates landscape architect, RLA, LEED-AP)
Lauren Schmidt (Schmidt Associates, landscape architecture intern)
The Project Team met at Double 8 Food headquarters on May 4th to review Craig and Lauren’s follow-up design work. A revised site plan concept was proposed.
The new plan, like the previous ones, seeks to channel stormwater along the eastern edge of the parking lot through a new infiltration trench to a central exposed rain garden in the southeast corner of the parking lot. Stormwater would flow via gravity following the natural contour of the site (see figure with elevations done by Schmidt).
This plan still allows absorption through the length of the rain garden along N Park Avenue but also increased the size of the basin in the southeast corner of the parking lot to accommodate high flow situations. This is also the low point of the parcel where the majority of run-off would directly enter the rain garden. This plan also modifies the previous plan by eliminating the barriers within the lot, allowing for more spaces and flexibility of spaces for Double 8 Foods parking. The plan retains the recycling bin onsite but positions it closer to the basin, rather than the building, allowing for better car movement in the parking lot. It also adds a cistern which will be necessary to off-set some high flows and will provide water for the plants in dry conditions. The dumpster and loading dock can be shielded using evergreen plantings. Isaiah requested no plantings along the edge of the building to reduce maintanance adn increase lanes within the lot. Sarah requested locations for educational placards, particularly at the basin region where individuals may be dropping off recycling. These could educate passers-by as well since the primary mode of transport to the Double 8 Foods is by foot.
There were several cross-sectional options to consider for the corridor garden along Park. Three sections were proposed by Schmidt which would vary in cost and infiltration potential.
These sections include a series of stepped basins separated by curbs (Section A), one wider and uniformly deep basin (Section B), and one wider by sloping basin (Section C). (See figure for ponding depths and widths.) We discussed the pluses and minuses of each possibility. We decided that Section B or C would be lower cost and could always be expanded to include an additional 6′ wide basin as shown in Section A. These would all retain the existing curb. We opted to request bids on each from potential contractors. In each scenario, this corridor of rain garden would be divided by check dams to reduce flow and increase infiltration as the water moves (by gravity) toward the basin. Action items include (1) determining the depth of the existing curb (which might impact whether Section B is viable with existing infrastructure), (2) doing an infiltration test, and (3) researching options such as Firestone EPIC System (collects water from its immediate surroundings, filters and retains it below ground, and reuses it for subsurface irrigation). Tyson agreed to do (1) and (2). Craig agreed to do (3).
We discussed the need for a similar cross-sectional design for the basin in order to have an accurate estimate/bid process initiated. Craig and Lauren agreed to work on this, pending the infiltration test results (to determine the depth needed).
We also reviewed a site plan for the larger Double 8 Foods parcel and adjacent parking lot. Although this will unlikely be addressed in this phase, we had agreed previously that it would be nice to have some concept drawings for future grant applications.
Other remaining action items include the following:
Matt will work with IndyGo on possible shelter options for along Fairfield.
Sarah will talk with RebuildIndy to see if any sidewalk and curb work, particularly the new curb cuts needed along Park, could be incorporated into their work in the area.
Matt will research possible cistern possibilities and KIB funds for this purpose.
Sarah will continue working on outreach with the neighborhood and area schools. This will increase once we have a installation date. She is working with Herron School of Art and Design to see if there could be some help with a visual communications plan as part of an existing class.
Meeting notes (3/25/11)
Attendees
Sarah Wiehe (IndyTilth project manager)
Isaiah Kuperstein (Double 8 Foods owner)
Matt Hostetler (KIB Project Greenspace manager)
Tyson Domer (IndyTilth construction manager)
Craig Flandermeyer (Schmidt Associates landscape architect, RLA, LEED-AP)
Lauren Schmidt (Schmidt Associates, landscape architecture intern)
Next Meeting
TBD week of 4/25/11, Double 8 store (Fairfield & Central) or Isaiah’s office
please reply with availability
The Project Team met at Sarah and Tyson’s on 3/25 to review Craig and Lauren’s initial design work. Two site plan concepts were proposed:
Plan A seeks to channel stormwater along the eastern edge of the parking lot through a new infiltration trench to a central exposed rain garden in the southeast corner of the parking lot. Stormwater would flow into the trench through permeable pavers, permeable asphalt or some other means. Craig explained that he was concerned that the volume and velocity of sheet runoff coupled with the gradient in the area of Sarah’s proposed rain gardens (the existing paved tree lawn) may overwhelm the plantings. Plan A proposes to retain the existing concrete curb in order to capture and direct stormwater into the trench but to remove the paving in the tree lawns so they may be used as planting strips. New street trees are proposed along Fairfield Avenue and Park Avenue. The recycling area remains in the southeast corner of the parking lot, but is somewhat masked by the rain garden and a new street tree along 34th Street. New pavers in the tree lawn on Park Avenue will facilitate pedestrian access from the south and east.
Plan B proposes to address the sheet runoff issue by coupling the existing tree lawn area with space borrowed from the parking strip along the eastern edge of the parking lot. Together t
hese areas would be reconstructed as a series of stepped weirs that would arrest the sheet flow while also providing space for traditional rain garden plantings and new street trees along Park Avenue. Plan B would likely require the removal of the existing concrete curb. Rain garden ‘islands’ are also proposed for the interior of the parking lot. Plan B also proposes to shift the Fairfield Avenue parking lot entrance to the east in order to accommodate additional plantings on the east side of the building. This would also require shifting the adjacent parking spaces to the east, which is leveraged to create space closer to the building for the recycling area. In addition, Plan B proposes to eliminate the north Park Avenue entrance to the parking lot and relocate the south Park Avenue entrance in order to align it with the entrance to the Our Redeemer church parking lot. This would at once accommodate the ‘natural’ pedestrian pathway to the store while also creating the potential for a larger rain garden in the southeast corner of the Double 8 parking lot.
Both plans propose using trench drains to capture and convey stormwater that would otherwise run out into the street through the parking lot entrances. Both plans also propose creating an area for a new bus shelter at the northeast corner of Fairfield Avenue and Park Avenue.
After reviewing the pros and cons of each approach, the team came to consensus on a direction for the next design iteration:
We should eliminate the north Park Avenue parking lot entrance per Plan B. This will prevent people from pealing out of the parking lot onto Park Avenue and continuing directly onto Fairfield Avenue at high speed. This will also make the proposed bus stop location safer. Matt will contact Annette at IndyGo to see about the possibility of moving the east-bound bus stop (route 4) to the corner of Park and Fairfield and adding bus shelters on both sides of Fairfield. New shelters should help to mitigate loitering issues at the Double 8 entrance.
We should relocate the Fairfield Avenue parking lot entrance per plan B to better align the curb cuts with the drive aisle. This will provide more buffer for pedestrians entering and exiting the Double 8. Tyson, Lauren and Matt met with Allyson Pumphrey from the City Office of Sustainability on 3/31; Allyson coordinated the change through the Rebuild Indy Project manager, who contacted Isaiah to verify new curb cut locations on 4/2. Thank You!
We should relocate the south Park Avenue parking lot entrance per Plan B. This will provide additional space for the central rain garden/water detention area in the southeast corner of the parking lot and also serve as a pedestrian pathway through the tree lawn. There may be additional opportunity to include a lateral east-west bump-out at the parking lot entrance per Plan B which would help to slow sheet flow, provide space for a sidewalk to further enhance pedestrian safety, and serve as a traffic calming device for drivers entering the parking lot.
We should probably retain the existing concrete curb from a cost standpoint. This may preclude pursuing the stepped weir approach from Plan B. However, we should still plan to remove the pavement from the tree lawn so street trees and other decorative, low-maintenance plantings can be installed. The existing concrete curb will still serve to capture and direct stormwater to a larger central rain garden area in the southeast corner of the parking lot (identified as a community garden in Plan B.)
We should not retain the permeable infiltration trench. Craig noted that some type of maintenance is likely required every year or two, but that eventually the pores in the paving material will clog with fines. Matt has used an industrial vacuum to maintain the permeable concrete parking lot at KIB. Isaiah noted that he prefers not to perform any mechanical maintenance. Sarah noted that using exposed rain gardens as facilities for both stormwater conveyance and infiltration is a low-tech solution that lends itself well to volunteer/community maintenance. Tyson is willing to coordinate a field trip to see the new permeable alleys on the Near Eastside. Per Allyson Pumphrey 3/31, the City has not yet decided on their preferred maintenance approach for permeable concrete and permeable asphalt surfaces.
We should adopt a configuration for the recycling bins similar to that proposed in Plan A since the recycling company needs space for two adjacent 40’ roll-off dumpsters in order to drop off an empty dumpster before picking up the full dumpster. Sarah noted that we will likely need to find a temporary location for the recycling dumpsters during construction. Sarah or Tyson will contact Our Redeemer church to see if we can use their parking lot during construction. Isaiah noted that it would be OK for Our Redeemer parishioners to park at Double 8 on Sundays during construction.
We should eliminate the planting strip along the east wall of the building since Isaiah noted that it will catch litter and debris, require additional maintenance by Double 8, and add to overall project cost.
We should revisit the idea of including a cistern to catch stormwater runoff from the roof. Matt noted that any trees provided by KIB must be supported by a watering and maintenance plan. Isaiah noted that water costs could be significant and there is no exterior hose bibb at Double 8. Craig noted that Firestone Specialty Products produces a ‘subterranean irrigation system’ product that may be useful to direct downspout water to trees in lieu of hand-watering from a cistern. Sarah noted that the cistern provides a more consistent, low-tech water supply for the trees and other plantings.
The southeast corner of the building may be an ideal location for a cistern since the three main roof drains shunt water to downspouts on the east side of the building. The dumpsters would need to be accessed by employees working outside on the main loading dock. The loading dock, dumpster and cistern could be shielded by a new ‘green screen’ planted with arborvitae, juniper, or some other evergreen. This may also satisfy the City requirement that dumpsters be enclosed. There is also opportunity to add a dedicated cardboard dumpster in the public recycling center.
Matt noted that through a KIB partnership with the Arts Council of Indianapolis there is an opportunity to pay an artist up to a $10K commission to paint a mural on the east side of the building. Isaiah noted that he engaged an artist to paint the existing ‘old fashioned’ signage. Craig noted that there is also an opportunity to reopen the windows which have been filled with masonry, but Isaiah noted that he has had issues with break-ins and vandalism.
Tyson, Lauren and Matt met with Allyson Pumphrey from the City Office of Sustainability on 3/31 to see if the City could complete any of the anticipated work as part of the Fairfield Avenue Rebuild Indy project. Allyson noted that the City will likely not be able to complete work that is not directly adjacent to Fairfield, including removing asphalt from the tree lawns, excavating the main rain garden/water detention area, or providing a topographic survey. She noted that it may be possible to get concrete pads poured for bus shelters if we could coordinate quickly with IndyGo. Allyson offered her assistance coordinating plan and drainage review and suggested that we should emphasize the elements of the project that will reduce City maintenance responsibilities.
Meeting notes (2/16/11)
Attendees
Sarah Wiehe (IndyTilth project manager)
Isaiah Kuperstein (Double 8 Foods owner)
Matt Hostetler (KIB Project Greenspace manager)
Tyson Domer (IndyTilth construction manager)
Craig Flandermeyer (Schmidt Associates landscape architect, RLA, LEED-AP)
Lauren Schmidt (Schmidt Associates, landscape architecture intern)
Next Meeting
Friday 3/25/11, 5:00pm, Double 8 store (Fairfield & Central)
The Project Team met at Double 8 with Craig and Lauren from Schmidt Associates to review existing site conditions, design considerations, and opportunities. Tyson noted that Craig and Lauren should think about the site holistically since we will continue to work with stakeholders on the Fairfield corridor and “Fairfield Triangle” in the future. Isaiah noted that the bus stops on Fairfield are well-used and Matt noted that KIB has worked with IndyGo in the past to place bus shelters. Sarah noted that many pedestrians access the Double 8 through the parking lot by cutting across the “tree lawn” directly across from the curb cut on Park Avenue that leads to the Our Redeemer parking lot. Site lighting is achieved through a combination of City street lights, IPL pole-mounted security lights, and building-mounted security lights. There are a total of 13 lights, of which Isaiah pays for 8. Sarah noted that there is an opportunity to address waste management issues and increase public recycling opportunities since the garbage dumpster is used mostly for cardboard. Isaiah will investigate the possibility of downsizing the garbage dumpster and adding a cardboard dumpster. Both dumpsters would need to be accessed by employees working outside on the main loading dock. Matt noted that there is potential for a painted mural on the side of the building through a KIB partnership. Isaiah noted that it would be desirable to incorporate plantings along the north edge of the parking lot. Matt noted that the City can often remove concrete and asphalt to accommodate new street trees that are planted through KIB programs. Isaiah noted that tree watering requirements may be an issue due to cost and manpower. Sarah noted that trees may be watered by volunteers if rainwater is available from a cistern. The group also toured the Double 8 in order to better understand how the flat roof drains, an important consideration for a potential rainwater cistern. Isaiah noted that he will be completing some emergency roof repairs, and that there may be opportunity to rework roof drains if he has to do more extensive roof work in the future. Isaiah will know more about the roof drains once he meets with his roofing contractor. Most of the roof drains to the east (parking lot) and south (loading dock) sides of the building, which would facilitate downspout modifications to accommodate a cistern. Tyson noted that the NRCS soil report for the general area indicates that the soil is classified as “Ug – Urban land-Genesee complex” which generally has a moderately-high to high capacity to transmit water. Craig noted that soil bores and percolation tests for specific infiltration locations will likely be required for permitting. Craig noted that for past rain garden projects Schmidt has had success specifying native plant plugs at 18”on center as long as they are maintained. Sarah noted that volunteer work days to complete plant installation and maintenance is part of the project plan. Tyson will contact Allyson Pumphrey (City Office of Sustainability) and Anna Jetmore-Vargas (Rebuild Indy) in order to investigate possible synergies and opportunities available through the City.
Meeting notes (1/6/11)
Attendees
Project Team
Sarah Wiehe (IndyTilth project manager)
Isaiah Kuperstein (Double 8 Foods owner)
Matt Hostetler (KIB project manager)
Tyson Domer (IndyTilth construction manager)
Next Meeting
Wednesday 2/2/11, 6:00pm, Double 8 store (Fairfield & Central)
Project Team & landscape architect only
Sarah announced that IndyTilth will be planting trees in the Broadway Area in partnership with KIB’s 2011 Neighborwoods program. Matt added that through the Neighborwoods program KIB may also provide appropriate trees for the Double 8 Rain Garden project. Matt and Sarah will coordinate with Andrew Hart (KIB Neighborwoods Program Director) as tree needs for the rain gardens become more clear.
Matt explained that KIB’s interests in the project are related to placemaking and community building; the possible addition of tree canopy is a bonus. Moving forward, the Project Team should use these objectives as a touchpoint when developing plans, coordinating events, etc. Sarah reiterated that the project will help cement the Double 8 as a community destination because it is the neighborhood grocery and community recycling hub; developing and implementing the educational components of the project will contribute to relationship building. Matt will check to see if KIB has any “one-pager” informational materials on rain gardens that can be used to help with community outreach.
The team wants to start the design process by Thinking Big! This means looking at the entire Double 8 site comprehensively, since this will increase our chances of leveraging the initial investment in this project to attract additional future investment to the “Fairfield Triangle” and Broadway Area. The team agreed that developing a comprehensive master plan is a good idea, even though the project budget may not be sufficient to implement all of the ideas in this phase of construction. Matt will identify community partners that are interested in contributing to the project, specifically a landscape architecture firm. Additionally, Isaiah expressed interest in eventually acquiring the vacant lot behind his store; Tyson will follow up with Isaiah and Doressa at MFCDC regarding identifying and contacting the current owner.
Matt will be meeting with Allyson Pumphrey from the City Office of Sustainability the week of January 10th to discuss ways that the City can interface with KIB and their project partners on green infrastructure projects like the Double 8 Rain Garden. Again, opportunity exists to leverage investment in this project for potential City infrastructure investments such as bus shelters (there is a loitering issue at Double 8 since there are currently no shelters at the bus stops), new curbs and sidewalks, and street paving. Tyson noted that Fairfield Avenue is scheduled to be resurfaced as part of the Rebuild Indy work. Tyson will follow up with Matt and Allyson after January 15th.
We will employ an “integrated design process” involving the Project Team, landscape architect, general contractors, and community members. This will help to keep the process transparent and make sure we are engaging the appropriate stakeholders. Matt will seek to engage a landscape architecture firm with the experience and capacity to provide accurate construction cost estimates. By also inviting interested contractors to participate directly in the design process, the Project Team will realize greater opportunity to value-engineer the project and fast-track the competitive bidding process.
Schedule Benchmarks & Tasks
2/2/11 site visit with landscape architect and Project Team
determine need for a soil percolation test
determine design meeting schedule
distribute design meeting schedule to community stakeholders (Sarah)
4/1/11 conceptual design complete
distribute bid package to general contractors (Tyson)
review potential KIB material contributions (Matt)
*4/24/11* Easter (D8 high-volume retail)
5/1/11 receive bid packages from general contractors
review bids
additional design & value-engineering
review potential KIB material contributions (Matt)
*5/8/11* Mother’s Day (D8 high-volume retail)
*5/30/11* Memorial Day (D8 high-volume retail)
6/15/11 sign contract with general contractor
GC must name Double 8 Foods as “additional insured”
*7/4/11* Independence Day (D8 high-volume retail)
7/15/11 general contractor begins heavy construction
GC must maintain unobstructed access to D8 loading dock and customer parking
615 E 34th Street (vacant lot) may be used as an additional staging area
8/15/11 general contractor completes heavy construction
*9/5/11* Labor Day (D8 high-volume retail)
9/11/11 (tentative) volunteer prep day
confirm commitment from 50% of volunteer crew (Sarah)
confirm parking at Our Redeemer Lutheran church (Sarah/Tyson)
confirm Port-o-Let (Tyson)
9/12/11 (tentative) volunteer planting day
provide food & water for volunteers (Isaiah)